§192.505 Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS

Current as of Oct 29, 2026Last amended Mar 22, 2021Official text on eCFR ↗

(a) Except for service lines, each segment of a steel pipeline that is to operate at a hoop stress of 30 percent or more of SMYS must be strength tested in accordance with this section to substantiate the proposed maximum allowable operating pressure. In addition, in a Class 1 or Class 2 location, if there is a building intended for human occupancy within 300 feet (91 meters) of a pipeline, a hydrostatic test must be conducted to a test pressure of at least 125 percent of maximum operating pressure on that segment of the pipeline within 300 feet (91 meters) of such a building, but in no event may the test section be less than 600 feet (183 meters) unless the length of the newly installed or relocated pipe is less than 600 feet (183 meters). However, if the buildings are evacuated while the hoop stress exceeds 50 percent of SMYS, air or inert gas may be used as the test medium.

(b) In a Class 1 or Class 2 location, each compressor station regulator station, and measuring station, must be tested to at least Class 3 location test requirements.

(c) Except as provided in paragraph (d) of this section, the strength test must be conducted by mai ntaining the pressure at or above the test pressure for at least 8 hours.

(d) For fabricated units and short sections of pipe, for which a post installation test is impractical, a preinstallation strength test must be conducted by maintaining the pressure at or above the test pressure for at least 4 hours.

Source: 35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192-85, 63 FR 37504, July 13, 1998; Amdt. 192-94, 69 FR 32895, June 14, 2004; Amdt. 195-94, 69 FR 54592, Sept. 9, 2004; Amdt. 192-120, 80 FR 12779, Mar. 11, 2015; 86 FR 2241, Jan. 11, 2021

Compiled from the Electronic Code of Federal Regulations (eCFR), an editorial compilation and not an official legal edition of the CFR. The official text is the Federal Register and the annual CFR edition. §192.505 on eCFR.

Sections that cite this one

  • §192.153 Components fabricated by welding.
  • §192.503 General requirements.
  • §192.506 Transmission lines: Spike hydrostatic pressure test.
  • §192.517 Records.
  • §192.620 Alternative maximum allowable operating pressure for certain steel pipelines.