§192.923 How is direct assessment used and for what threats?

Current as of Oct 29, 2026Last amended Mar 16, 2026Official text on eCFR ↗

(a) General. An operator may use direct assessment either as a primary assessment method or as a supplement to the other assessment methods allowed under this subpart. An operator may only use direct assessment as the primary assessment method to address the identified threats of external corrosion (EC), internal corrosion (IC), and stress corrosion cracking (SCC).

(b) Primary method. An operator using direct assessment as a primary assessment method must have a plan that complies with the requirements in—

(1) Section 192.925 and ASME B31.8S (incorporated by reference, see § 192.7) Section 6.4, and NACE SP0502 (incorporated by reference, see § 192.7) , if addressing external corrosion (EC).

(2) Section 192.927 and NACE SP0206 (incorporated by reference, see § 192.7), if addressing internal corrosion (IC).

(3) Section 192.929 and NACE SP0204 (incorporated by reference, see § 192.7), if addressing stress corrosion cracking (SCC).

(c) Supplemental method. An operator using direct assessment as a supplemental assessment method for any applicable threat must have a plan that follows the requirements for confirmatory direct assessment in § 192.931.

Source: 68 FR 69817, Dec. 15, 2003, as amended by Amdt. 192-114, 75 FR 48604, Aug. 11, 2010; Amdt. 192-119, 80 FR 178, 182, Jan. 5, 2015; 80 FR 46847, Aug. 6, 2015; Amdt. 192-132, 87 FR 52274, Aug. 24, 2022; Amdt. 192-135, 89 FR 33282, Apr. 29, 2024

Compiled from the Electronic Code of Federal Regulations (eCFR), an editorial compilation and not an official legal edition of the CFR. The official text is the Federal Register and the annual CFR edition. §192.923 on eCFR.

Sections that cite this one

  • §192.7 What documents are incorporated by reference partly or wholly in this part?
  • §192.710 Transmission lines: Assessments outside of high consequence areas.
  • §192.911 What are the elements of an integrity management program?
  • §192.919 What must be in the baseline assessment plan?
  • §192.921 How is the baseline assessment to be conducted?
  • §192.937 What is a continual process of evaluation and assessment to maintain a pipeline's integrity?
  • §192.947 What records must an operator keep?